title: "Five approval bottlenecks that cost you a week every month"
description: "Five approval bottlenecks that add days to every request, how to measure queue time from timestamps you already have, and which one to fix first."
url: https://blog.octacraft.com/workflow-automation-approval-bottlenecks/
date: 2026-11-06
modified: 2026-11-28
author: "Philip Bassey"
image: https://blog.octacraft.com/wp-content/uploads/2026/11/workflow-automation-approval-bottlenecks-feature-card-padded.png
categories: ["Smart Systems"]
tags: ["business process workflow automation", "workflow automation crm", "workflow automation examples", "workflow management", "workflow management tools"]
type: post
lang: en
---

# Five approval bottlenecks that cost you a week every month

Table of Contents

[Toggle](#)

- [The short version](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#The_short_version)
- [The short answer](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#The_short_answer)
- [Do any of these sound like you?](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Do_any_of_these_sound_like_you)
- [How to measure approval time without buying software](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#How_to_measure_approval_time_without_buying_software)
  - [Timestamp three moments: request, decision, handoff](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Timestamp_three_moments_request_decision_handoff)
  - [Queue time versus work time](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Queue_time_versus_work_time)
  - [Workflow management: the discipline this sits inside](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Workflow_management_the_discipline_this_sits_inside)
- [Bottleneck 1: the approver of one](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Bottleneck_1_the_approver_of_one)
- [Bottleneck 2: the wrong channel](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Bottleneck_2_the_wrong_channel)
  - [Workflow automation CRM: where the approval history goes missing](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Workflow_automation_CRM_where_the_approval_history_goes_missing)
- [Bottleneck 3: the two-signature threshold](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Bottleneck_3_the_two-signature_threshold)
- [Bottleneck 4: the approver without context](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Bottleneck_4_the_approver_without_context)
- [Bottleneck 5: the missing escalation clock](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Bottleneck_5_the_missing_escalation_clock)
- [What a week of approval delay costs](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#What_a_week_of_approval_delay_costs)
- [Which bottleneck do you fix first?](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Which_bottleneck_do_you_fix_first)
  - [Score by frequency times delay](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Score_by_frequency_times_delay)
  - [The one you can fix this week](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#The_one_you_can_fix_this_week)
- [When to bring in help](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#When_to_bring_in_help)
- [What changes after you automate the approval path](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#What_changes_after_you_automate_the_approval_path)
  - [Workflow management tools: buy for the queue, not the form](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Workflow_management_tools_buy_for_the_queue_not_the_form)
  - [Business process workflow automation: when the path crosses departments](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Business_process_workflow_automation_when_the_path_crosses_departments)
  - [Workflow automation examples: one purchase order on two paths](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Workflow_automation_examples_one_purchase_order_on_two_paths)
- [Frequently asked questions](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Frequently_asked_questions)
  - [How do I reduce approval time without new software?](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#How_do_I_reduce_approval_time_without_new_software)
  - [What is a good approval turnaround time?](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#What_is_a_good_approval_turnaround_time)
  - [Is approval delay a workflow automation problem?](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#Is_approval_delay_a_workflow_automation_problem)
  - [How many approvers should one request have?](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#How_many_approvers_should_one_request_have)
  - [What is the difference between queue time and cycle time?](https://blog.octacraft.com/workflow-automation-approval-bottlenecks/#What_is_the_difference_between_queue_time_and_cycle_time)

## The short version

- Approval delay is mostly queue time, and most workflow automation budgets go to the other half. The decision takes minutes. The waiting takes days.
- Five bottlenecks account for most of it: the approver of one, the wrong channel, the two-signature threshold, the approver without context, and the missing escalation clock.
- You can measure all five with dates you already have, and none of them needs software to find them.
- Workflow automation fixes a queue it can see. Put every request on one channel and give it a clock first, then automate the path.

The purchase order has been with Finance since Tuesday. The approver reads it in two minutes when she gets to it. The other four days are the part nobody records.

Approval delay is the time between a request being raised and the work starting, and almost all of it is waiting. Queue time is the hours an item spends waiting for someone’s attention. Work time is the hours someone spends handling it. Lean practice calls the sum of both lead time, the time one item takes to move through a process from start to finish ([Lean Enterprise Institute](https://www.lean.org/lexicon-terms/value-stream-mapping/)). Queue time is also the number most workflow automation reports leave out.

Most workflow automation projects go after the work: the checking, the matching, the rekeying. Those costs are real, and they are the smaller half of this problem. A team that reads an invoice in two minutes and takes nine days to say yes has a queue problem.

## The short answer

> Approvals stall in five predictable places: one person is the only approver, the request arrives on the wrong channel, the amount sits just under a threshold that still wants two signatures, the approver lacks the context to decide, and no clock escalates a request that has gone quiet. Each adds days nobody measures.

That list is also the order to diagnose it in. None of the five needs software. You need three dates per request, a spreadsheet, and an afternoon.

All five survive a workflow automation rollout, because automation carries the route it is handed. Fix the route first and the tool has something worth running.

## Do any of these sound like you?

- The invoice is approved on the day it is read and paid two weeks later, and everyone blames the bank.
- You know a request exists because somebody mentioned it in a group chat.
- A purchase order for $4,900 needs one signature. One for $5,100 needs two, and the second approver is traveling.
- The approver replies with a question, and the question sits in a thread for three days.
- Nothing tells you which requests are old. You find out when a supplier calls.

One of those is a habit. Two or more is a system, and it is the reason a workflow automation project can deliver and still leave you waiting.

## How to measure approval time without buying software

Every approval leaves three dates behind, and all three already exist somewhere you can reach: an inbox, a shared drive, a system log. Pull thirty requests from last quarter and put four columns in a spreadsheet: an identifier and the three dates. This is the measurement a workflow automation project should start with, and it costs an afternoon.

### Timestamp three moments: request, decision, handoff

Record the date the request was raised, the date the decision was taken, and the date the work actually began. Two waits sit between those dates, and the second one is the one teams forget. A workflow automation vendor will ask for these three dates during discovery, so collect them before you speak to anyone.

![A five-step diagram of the approval path in a workflow automation diagnosis, showing the three dates to capture and the two waits between them](https://blog.octacraft.com/wp-content/uploads/2026/11/01-three-dates-two-waits.png)*Diagram: three dates to capture and two waits to name on one approval path. Source: Octacraft, November 2026.*

An item can be decided and still not moving. Somebody said yes on Thursday and the work starts on Tuesday, because the approval went back into an inbox as a notification. That second wait is invisible in every report that tracks approvals, since the approval itself is complete. Workflow automation that moves only the decision leaves this wait exactly where it was.

### Queue time versus work time

The split matters because it changes who you talk to. Work time responds to better tools and clearer rules. Queue time responds to an owner, one channel and a clock. Most workflow automation shortens work time, which is why so many projects leave the delay untouched.

![An infographic separating queue time from work time in an approval workflow automation diagnosis, with four examples of each](https://blog.octacraft.com/wp-content/uploads/2026/11/02-two-kinds-of-delay.png)*Infographic: queue time and work time, with four examples of each. Source: Octacraft, November 2026.*

Run the split across your thirty requests and one number usually stands out. Queue time is the larger share, often by a wide margin, and it sits with people who do not think of themselves as part of the approval at all.

### Workflow management: the discipline this sits inside

Workflow management is the practice of deciding who does what, in what order, and what happens when a step stalls. It is older than the software sold under that name, and it does not require any. The approval path is usually the part where a firm has no written rule at all: the steps exist, but nobody wrote down the clock.

You are not buying workflow management here. You are measuring one path, so the workflow automation that follows has a baseline to beat. Writing the steps down first is the order we argue for in [process documentation for automation](https://blog.octacraft.com/process-documentation-automation/). Skipping it is why so few workflow automation projects can show what they improved.

## Bottleneck 1: the approver of one

One name sits on the route and no deputy sits behind it. The request is not stuck because the decision is hard. It is stuck because the only person who can make it is traveling, ill, or in meetings for a week.

The cause is age. The route was set when the team was four people and the founder signed everything. By the time a workflow automation project reaches it, the rule is older than half the team and nobody has revisited it, because it appears to work.

Name a deputy and the rule for when the deputy takes over. Two working days is a common line. Pick one and write it down, because a deputy nobody knows about absorbs nothing. This repair costs nothing, and it removes the most common reason a workflow automation route stalls.

## Bottleneck 2: the wrong channel

The request arrives by chat, by email to whoever is online, or by a verbal ask in a corridor. None of those creates a queue, so none of them can be aged, counted or escalated. The approval happens. The record of it does not.

A workflow automation project inherits whatever channel is already in use, and that is usually three channels at once. It picks one and the other two keep running beside it.

That matters beyond tidiness. An approval with no record cannot be audited, so whatever the control was meant to prove, there is nothing to show. It cannot be automated either, because workflow automation needs an item with a state, an owner and a timestamp. A chat message has none of the three.

### Workflow automation CRM: where the approval history goes missing

CRM approvals are the worst case, because the deal record looks complete. A discount is agreed on a call, somebody senior says yes in an email, and the opportunity moves stage. Workflow automation in a CRM records the stage change, not the decision, so the history begins after the part that mattered.

The fix is to ask for the approval inside the record it applies to, with the date and the approver named. Where the tool cannot do that, log the decision in a field and treat the field as the record.

## Bottleneck 3: the two-signature threshold

A threshold set for control adds a wait to every request near the line. The rule is usually a round number chosen years ago, and nothing about it changes when the business does. Below the line, one signature. Above it, two, and the second one starts only after the first.

Microsoft’s walkthrough of a sequential approval uses exactly this case: an invoice over $1,000 needs pre-approval before Finance signs off, and each stage waits for the one before it ([Microsoft Learn, updated 4 December 2025](https://learn.microsoft.com/en-us/power-automate/sequential-modern-approvals)). Sequence is the cost. Two approvers in parallel cost one wait. Two in sequence cost two, because the second approver’s clock starts when the first replies. Microsoft documents the parallel route as independent decisions, where each approver acts without waiting for the others ([Microsoft Learn, updated 3 September 2025](https://learn.microsoft.com/en-us/power-automate/parallel-modern-approvals)).

Segregation of duties is the reason the second signature exists, and it is worth keeping. The GAO’s internal control standards ask management to separate the authority to approve a transaction from the duty to process and record it ([GAO-25-107721, May 2025, paragraphs 10.21 to 10.23](https://www.gao.gov/assets/gao-25-107721.pdf)). Nothing there requires the two signatures to happen one after the other.

Review the threshold against actual losses, then move the two approvers into parallel wherever the control allows it. The control stays the same and the delay does not. This is the bottleneck workflow automation inherits most faithfully, because a badly drawn rule is easy to encode.

## Bottleneck 4: the approver without context

The request arrives with a total and a supplier name. The approver cannot see the contract, the budget line, or the last three invoices from that supplier. She asks one question, and the item waits a day for the answer.

This one hides well, because it looks like diligence. The waste is upstream: the request was built to be read by someone who already knew the answer. Attach the four things she always asks for. In most firms those are the contract or rate, the budget line and its balance, the last invoice from the same supplier, and the reason the spend is happening now. This is the cheapest workflow automation win of the five, because it is a form revision.

## Bottleneck 5: the missing escalation clock

No timer, no owner, no nudge. A request that has gone quiet stays quiet, because nobody is accountable for noticing. The item is not rejected and not forgotten. It is unsupervised, and an unsupervised queue grows.

Public sector buyers solved this with a date and a penalty. Under the Prompt Payment clause, an invoice is due 30 days after a proper invoice arrives, and interest accrues automatically when payment is late ([FAR 52.232-25, acquisition.gov](https://www.acquisition.gov/far/52.232-25)). The clause works because the clock belongs to the request, not to the approver’s memory.

You do not need statutory interest. You need a date on every request, a list sorted by age, and one name who owns the list. Twenty minutes a week on that list beats any reminder email, because it produces a decision rather than a nudge. Every workflow automation tool sells this under some other name.

| Bottleneck | What you see | Who feels it | Fix that needs no build |
| --- | --- | --- | --- |
| The approver of one | One name on the route, no deputy behind it | The requester, and the supplier waiting for an answer | Name a deputy and the rule for when the deputy acts |
| The wrong channel | Requests in chat, email and corridor conversations | Whoever has to prove later who agreed | One intake form for every request of that type |
| The two-signature threshold | A second approver who starts only after the first replies | Every request just above the line | Review the threshold, then run the two signatures in parallel |
| The approver without context | A clarifying question that costs a day | The approver, then the requester waiting on the reply | Attach the four documents the approver always asks for |
| The missing escalation clock | No age on the request, no owner for old items | Everyone downstream of the queue | A date on every request and a weekly aging list with one owner |

*Table: the five approval bottlenecks, what each looks like in practice, who absorbs the delay, and the fix that needs no software. Source: Octacraft, November 2026.*

## What a week of approval delay costs

The delay is normal, and it is large. Ardent Partners surveyed 212 accounts payable professionals and put the average time to process a single invoice at 9.2 days. The best-performing fifth of that sample did the same work in 3.1 days, and everyone else took 17.4 ([Ardent Partners, AP Metrics That Matter in 2025](https://www.datocms-assets.com/80283/1744404602-ardent-partners-ap-metrics-that-matter-in-2025-pagero-final.pdf), from its 2024 survey). That is industry survey data, not a regulator’s count. In the same survey, 41 percent named longer cycle times as a chronic problem.

Same task, same documents, more than five times the elapsed time. The work in the fastest fifth is not five times faster. The waiting is shorter. That gap is the argument for measuring, and it is not by itself an argument for buying workflow automation.

Five bottlenecks that each add a day do not add five days to the month. They add five days to every request that passes all five, which is how a month quietly loses a week.

Four numbers turn days into money. Requests raised per month. Average days in queue. The value of the work waiting behind each request. The hours your team spends chasing, which is a real cost even when it never reaches a timesheet.

Here is the shape of the arithmetic with round figures, chosen so you can follow it rather than to describe any firm we have worked with. A team raises 240 approvals a month, about 11 a working day, and each waits 4.6 working days. Multiply the arrival rate by the wait and roughly 52 requests are open at any moment. If each one holds up work worth $1,500, about $78,000 of work is parked rather than lost. The approver’s salary is not the cost. The parked work is.

Put your own four numbers in and you have a figure you can defend, because every input came from your log. That is what a workflow automation budget holder should be shown: a cost model, not an estimate.

## Which bottleneck do you fix first?

Do not start with the one that annoys you most. Start with the one that scores highest, because the score is what turns a complaint into a case. Workflow automation will not rank them for you. The ordering logic is the one we use for [choosing a first process to automate](https://blog.octacraft.com/automation-strategy-decision-tree/): the largest delay with the cheapest fix.

### Score by frequency times delay

Count how many of your thirty requests each bottleneck affected, then estimate the days it added to each. Multiply the two. A bottleneck that hits every request and adds half a day scores higher than one that hits two requests and adds five. Frequency is easy to count and hard to argue with. Score the five before anyone scopes a workflow automation purchase, because a vendor’s discovery will ask the same questions with less of your data.

### The one you can fix this week

Two fixes need no build and no budget. The first is one intake form with five fields: what is being approved, the amount, the date, who is asking, and the documents the approver will want. The second is a clock on the list those requests land in, so anything untouched for two working days goes to a named person.

Neither is workflow automation, and both make it possible later. The form creates the item. The clock creates the age. Without those two, every automation project starts by rebuilding the record it should have inherited.

## When to bring in help

Diagnose this yourself when one path is involved, one system holds the record, and the approvers agree on who decides. That covers most firms under a few hundred people. If that is you, measure first. A workflow automation purchase is premature until the route has an owner. Bring in help when the path crosses three or more systems with no shared identifier, or when a workflow automation scope keeps growing because nobody will settle who owns the decision.

One honest line before you spend anything: if you cannot name the approver for a type of request, stop. No tool fixes an unowned decision, and buying one first hides the problem for another quarter.

## What changes after you automate the approval path

Four things, and none of them is fewer approvals. A visible queue, so age is a property of the request. One channel, so every request has a state. An audit trail, so the decision has a date and a name. Fewer stranded items, because something is watching the clock. That is what workflow automation changes here, and it is worth more than a faster approval click.

The controls stay. What changes is how long a control takes to apply, and whether anyone can prove afterwards that it did. Same argument as [business process automation for operators](https://blog.octacraft.com/business-process-automation/): the tool is the last step, not the first.

### Workflow management tools: buy for the queue, not the form

Most workflow management tools are bought for the form builder and needed for the queue view. Ask three questions of any tool before you buy. Can it list every open request with its age? Can it escalate on a rule rather than on someone remembering? Can it record a decision where the next person will see it? A tool that answers all three will shorten queue time. A tool that answers none is a form with a monthly fee.

### Business process workflow automation: when the path crosses departments

Business process workflow automation is the same work at a wider scope: purchase to pay, quote to cash, onboarding. Approvals multiply as the path crosses departments, because each one adds a gate and a name. Automate one path end to end before widening, then use its queue data to argue for the second.

### Workflow automation examples: one purchase order on two paths

On the old path, the request is an email with a PDF attached. It goes to one approver, who may be traveling. Nobody knows its age, and the second signature happens after the first replies. The requester chases in a group chat, which produces an answer and no record. No workflow automation can age an item it never received.

On the new path, the request is an item with a timestamp and an owner. It goes to a named approver and a named deputy. Above the threshold, both signatures are requested at once. If neither acts in two working days, the item appears on an aging list with a name against it. The requester sees the state without asking anyone, and the decision is recorded where the work continues.

Both paths approve the same purchase order. The difference is that one has an age and an owner, and the other has a memory.

## Frequently asked questions

- ### How do I reduce approval time without new software? Put every request of one type through a single form, add a date to each, and give one person a weekly list sorted by age. Those three changes fix the channel and the clock, the two bottlenecks that need no build. Measure for a month before you buy any workflow automation.
- ### What is a good approval turnaround time? There is no universal number, and any figure quoted without context is a sales device. The useful test is internal: the fastest quarter of your own requests shows what your path can do when nobody is waiting. The gap between that and the average is your recoverable delay.
- ### Is approval delay a workflow automation problem? Only partly. Workflow automation removes handling work and makes the queue visible. It cannot give a request an owner, force one channel, or add a clock, because those are policy decisions. Automating a path with no owner produces a faster queue that still stalls.
- ### How many approvers should one request have? As few as the control requires, and no fewer. Two signatures exist to separate the authority to approve from the duty to process and record. If both are needed, run them in parallel rather than in sequence, and revisit the amount that triggers the second one.
- ### What is the difference between queue time and cycle time? Queue time is the part of the wait when nobody is working on the item. Cycle time is the whole span from request to finished work, so it contains queue time plus work time. A team can cut cycle time by shortening the queue without making the work itself any faster.

If approvals are the thing eating your week, [tell us which approval and how long it waits](https://go.octacraft.com/timeback/). We will say which of the five you have and what the first fix is, before you spend anything on workflow automation.

**Related reading:** an approval chain is usually one step inside [business process automation](https://blog.octacraft.com/business-process-automation/), and the build-versus-buy question behind it sits with [Built to Order](https://blog.octacraft.com/category/built-to-order/). The approval chain that usually stalls first is the one on incoming invoices: [invoice processing without the typing](https://blog.octacraft.com/invoice-processing-automation/).

Related reading: the approval chain that runs on paper before a new hire does anything is onboarding. [Employee onboarding paperwork](https://blog.octacraft.com/employee-onboarding-paperwork/) sets out which steps can fire from one completion event and which signatures still have to stay with a person.

*Philip Bassey is Octacraft’s Chief of Staff. As part of his responsibilities, he oversees the interdepartmental activities to see that our processes are documented and those that need publishing are published. He writes about the work between a system going live and a team trusting it.*