title: "The requirements session we run before quoting a build"
description: "A ninety minute requirements gathering session, run before we quote: who sits in the room, the five questions, the six pages that come out, and the three findings that stop a build."
url: https://blog.octacraft.com/requirements-gathering-session/
date: 2026-11-11
modified: 2026-11-28
author: "Philip Bassey"
image: https://blog.octacraft.com/wp-content/uploads/2026/11/requirements-gathering-session-feature-card-padded.png
categories: ["Open Craft"]
tags: ["software discovery phase", "statement of work software"]
type: post
lang: en
---

# The requirements session we run before quoting a build

Table of Contents

[Toggle](#)

- [Why the first ninety minutes decide the build](https://blog.octacraft.com/requirements-gathering-session/#Why_the_first_ninety_minutes_decide_the_build)
- [Who belongs in the room](https://blog.octacraft.com/requirements-gathering-session/#Who_belongs_in_the_room)
  - [The person who does the work today](https://blog.octacraft.com/requirements-gathering-session/#The_person_who_does_the_work_today)
  - [The person who signs the check](https://blog.octacraft.com/requirements-gathering-session/#The_person_who_signs_the_check)
  - [The person who runs it after launch](https://blog.octacraft.com/requirements-gathering-session/#The_person_who_runs_it_after_launch)
  - [The builder who will write it](https://blog.octacraft.com/requirements-gathering-session/#The_builder_who_will_write_it)
- [The five questions that surface the real process](https://blog.octacraft.com/requirements-gathering-session/#The_five_questions_that_surface_the_real_process)
  - [1. Walk me through the last one you did, from the start](https://blog.octacraft.com/requirements-gathering-session/#1_Walk_me_through_the_last_one_you_did_from_the_start)
  - [2. What did you do the last time it went wrong?](https://blog.octacraft.com/requirements-gathering-session/#2_What_did_you_do_the_last_time_it_went_wrong)
  - [3. Who touches this after you, and what do they need?](https://blog.octacraft.com/requirements-gathering-session/#3_Who_touches_this_after_you_and_what_do_they_need)
  - [4. How many in a week, and which day is busiest?](https://blog.octacraft.com/requirements-gathering-session/#4_How_many_in_a_week_and_which_day_is_busiest)
  - [5. What would you stop doing if this worked?](https://blog.octacraft.com/requirements-gathering-session/#5_What_would_you_stop_doing_if_this_worked)
- [The requirements gathering agenda, minute by minute](https://blog.octacraft.com/requirements-gathering-session/#The_requirements_gathering_agenda_minute_by_minute)
- [What comes out of the session](https://blog.octacraft.com/requirements-gathering-session/#What_comes_out_of_the_session)
- [What the software discovery phase is, and what it is not](https://blog.octacraft.com/requirements-gathering-session/#What_the_software_discovery_phase_is_and_what_it_is_not)
- [What the statement of work software has to contain](https://blog.octacraft.com/requirements-gathering-session/#What_the_statement_of_work_software_has_to_contain)
- [Three reasons to stop before the build starts](https://blog.octacraft.com/requirements-gathering-session/#Three_reasons_to_stop_before_the_build_starts)
  - [Nobody owns the process](https://blog.octacraft.com/requirements-gathering-session/#Nobody_owns_the_process)
  - [The volume is a guess](https://blog.octacraft.com/requirements-gathering-session/#The_volume_is_a_guess)
  - [The exceptions outnumber the rule](https://blog.octacraft.com/requirements-gathering-session/#The_exceptions_outnumber_the_rule)
- [What we ask you to bring](https://blog.octacraft.com/requirements-gathering-session/#What_we_ask_you_to_bring)
- [Frequently asked questions](https://blog.octacraft.com/requirements-gathering-session/#Frequently_asked_questions)
  - [How long should a requirements gathering session take?](https://blog.octacraft.com/requirements-gathering-session/#How_long_should_a_requirements_gathering_session_take)
  - [What is the difference between requirements gathering and a discovery phase?](https://blog.octacraft.com/requirements-gathering-session/#What_is_the_difference_between_requirements_gathering_and_a_discovery_phase)
  - [Who should attend a requirements gathering session?](https://blog.octacraft.com/requirements-gathering-session/#Who_should_attend_a_requirements_gathering_session)
  - [What should come out of requirements gathering?](https://blog.octacraft.com/requirements-gathering-session/#What_should_come_out_of_requirements_gathering)
  - [Can you quote a build without a requirements gathering session?](https://blog.octacraft.com/requirements-gathering-session/#Can_you_quote_a_build_without_a_requirements_gathering_session)

### The short version

- Requirements gathering is the ninety minutes where we decide whether a build can be priced at all.
- The five questions that matter are about the work as it happens today, not the software you want.
- The session produces six pages: a process map, exceptions, data, integrations, decisions, and the scope boundary.
- Four people sit in the room, and the read-back at the end is part of the agenda, not a follow-up email.
- Three findings stop a build early: nobody owns the process, the volume is unknown, the exceptions outnumber the rule.

The quote arrives with a price, a delivery window, and one line near the bottom: final scope to be confirmed during discovery. That line is where the argument starts later.

We run requirements gathering before we write the number. Below is the agenda we use, the questions that carry it, and the six pages a client should hold before signing.

## Why the first ninety minutes decide the build

A wrong price is a symptom. The cause is a requirements gathering session that never happened, or one where the client described software and nobody asked how the work gets done today.

The cost curve behind this is documented. Barry Boehm and Victor Basili ranked it first: finding and fixing a software problem after delivery is often 100 times more expensive than finding and fixing it during the requirements and design phase ([Software Defect Reduction Top 10 List](https://www.cs.umd.edu/projects/SoftEng/ESEG/papers/82.78.pdf), IEEE Computer, January 2001).

The same paper says projects spend 40 to 50 percent of their effort on avoidable rework. About 80 percent of that rework comes from 20 percent of the defects, and most of those begin as an unasked question.

Boehm and Basili added a caveat vendors leave out: for small, noncritical systems the ratio is closer to 5 to 1. A two week internal tool does not need the ceremony of a payment system, though risk still sets the size of the session.

Inside the first ninety minutes of requirements gathering, a change of scope costs a sentence. At month four it costs a change order, a rebuilt screen, and trust. That argument holds for a five thousand dollar tool as much as a platform.

## Who belongs in the room

Four seats in a requirements gathering session, and each answers a question the others cannot. The wrong four produce a document that sounds complete and prices the wrong thing.

### The person who does the work today

Not their manager. The doer holds the exceptions, and the exceptions decide the price. Ask a supervisor how invoices are processed and you get the policy. Ask the clerk and you get the workaround for the supplier who sends two purchase order numbers on one PDF.

### The person who signs the check

They decide two things: what the system must never do, and what happens if the build slips a quarter. Both shape scope more than any feature request, and neither survives being passed along second hand.

### The person who runs it after launch

Support, operations, whoever answers the phone when the batch fails. Their questions are about recovery, visibility, and who they call. A build priced without them adds a support contract nobody planned for.

### The builder who will write it

One engineer in the room, asking what changes the design: what identifies a record, what happens when two people edit the same row, what the data looks like on the worst day. Without a builder, requirements gathering becomes note taking that gets reinterpreted later.

## The five questions that surface the real process

Five questions carry the requirements gathering session. Each has a follow-up, because the first answer is almost always the tidy version.

### 1. Walk me through the last one you did, from the start

Past tense, one instance, out loud. This is the most productive requirements gathering question we ask, because a real example exposes the order things happen in. Follow up: what did you open first, and where did that file come from?

### 2. What did you do the last time it went wrong?

The exception path is where scope lives. A missing delivery note, a duplicate payment, a customer who changes the order after approval. Follow up: how often, and who fixes it now?

### 3. Who touches this after you, and what do they need?

Every handoff is an interface, and every interface has a format. Follow up: what do you send them, and what comes back when it is wrong?

### 4. How many in a week, and which day is busiest?

Volume sets the architecture. Ten a week and a thousand a week are different systems, different costs, and different testing plans. Follow up: where is that number recorded, and can we see it?

### 5. What would you stop doing if this worked?

This is the question nobody prepares for, and the one that names the goal. If the answer is nothing, the build adds a system to the pile. Follow up: who would notice if that stopped?

## The requirements gathering agenda, minute by minute

Ninety minutes of requirements gathering, six segments, one person writing in the shared document while the room talks. A segment that runs long steals from the read-back, which is where errors get caught.

| Minute | Segment | Who answers | What we write down |
| --- | --- | --- | --- |
| 0 to 10 | The decision this build supports, in one sentence | The person who signs | The outcome, and the date it matters by |
| 10 to 30 | One real case, end to end | The person who does the work | The steps in order, who does each, where the data comes from |
| 30 to 50 | Where that case breaks | The person who does the work, plus support | Each exception, how often it happens, who fixes it today |
| 50 to 65 | Systems, files and the handoffs between them | The builder, asking | Every system touched, its owner, the format passed across |
| 65 to 80 | Volume, deadlines, the busiest day | The person who signs, plus operations | Counts per week, peak periods, the report the count came from |
| 80 to 90 | Read-back of the scope boundary | Everyone | What is in, what is out, and the corrections made in the room |

*Table: the ninety minute requirements gathering agenda we run before quoting a custom build. Source: Octacraft method, November 2026.*

![Requirements gathering agenda as a vertical flow: six timed segments, from the decision the build supports to the scope read-back at minute eighty](https://blog.octacraft.com/wp-content/uploads/2026/11/requirements-session-agenda.png)*Diagram: Octacraft, from the requirements gathering agenda we run, November 2026*

The requirements gathering read-back is blunt. We read the boundary aloud: these five things are in, these three are out, this is what we need you to decide. A correction at minute 85 costs nothing. The same correction after the quote costs a week.

## What comes out of the session

Six pages come out of requirements gathering, written the same day and sent for correction within 48 hours. They are working documents, and each answers a question the quote depends on.

- **The process map.** Steps in order, the role at each step, the input and output. No software names.
- **The exception list.** Each break, how often it happens, who handles it now. This page decides whether the build handles exceptions or only the rule.
- **The data list.** Fields that must be captured, where they come from today, and which a report already depends on.
- **The integrations list.** Every system the work touches, the direction of the data, who owns the other end.
- **The decision log.** What was decided, by whom, and what is still open. This page stops the same meeting happening twice.
- **The scope boundary.** Three to six lines on what this build does, and an explicit list of what it does not.

The requirements gathering boundary is the page that gets signed. It is also the one clients find uncomfortable, because it names the things they assumed were included.

This agenda is the artifact we can publish. A filled page from a delivered project stays with that client, because it carries their names, volumes and system names. The shape is what transfers.

The standard for the writing is not ours. ISO/IEC/IEEE 29148:2018 defines what a good requirement is and lists the information items the activity should produce ([IEEE SA, published 30 November 2018](https://standards.ieee.org/standard/29148-2018.html)). We do not hand a client a 92 page standard. We use its test: a requirement you cannot verify is not a requirement.

NASA’s guidance is blunter and more useful in the room. It asks whether a requirement can be tested, and it bans vague terms by name: flexible, user friendly, fast, sufficient, robust and adequate ([NASA, Appendix C: How to Write a Good Requirement](https://www.nasa.gov/reference/appendix-c-how-to-write-a-good-requirement/)). When a client says the system must be easy to use, that goes in the decision log as an open question, not in the scope boundary.

## What the software discovery phase is, and what it is not

The software discovery phase is the wider period where the problem gets understood before anything is built. Our ninety minutes of requirements gathering is the pricing gate inside that phase, not a replacement for it.

The UK Government Digital Service publishes how it runs discovery. Its guidance sets the boundary: around 4 to 8 weeks is typical, and you should not start building in discovery ([GOV.UK Service Manual, updated 21 June 2021](https://www.gov.uk/service-manual/agile-delivery/how-the-discovery-phase-works)).

Four weeks of discovery is right when nobody knows whether the problem is worth solving. It is wrong when the process is known and the only open question is the price. Requirements gathering covers the second case, and we say which one you are in before booking.

## What the statement of work software has to contain

A statement of work software project runs on a document and the tools that generate it. Both fail the same way: deliverables get described, the boundary does not.

Ours is short, and it starts from the requirements gathering pages. Those are attached rather than summarized. The build section names what is delivered, in what order, and what acceptance means for each item. The exclusions repeat the boundary word for word, including the three things the client assumed were included.

The commercial section follows the exception list. If most of the work is the rule, one fixed price covers it. If exceptions carry a third of the volume, the document prices phases and says so, and [the cost breakdown](https://blog.octacraft.com/custom-software-development-cost/) shows where the ranges come from.

## Three reasons to stop before the build starts

Some requirements gathering sessions end with no quote, and that is the right outcome. Three findings cause it.

### Nobody owns the process

If two departments describe the same process differently and neither can change it, the build will be rejected by the side that loses. A system cannot settle an argument with no decision maker.

### The volume is a guess

When nobody can produce a count, nobody can size the build. Ten a week and a thousand a week are different systems. We ask for the report. If it does not exist, we offer to measure for two weeks before quoting.

### The exceptions outnumber the rule

If most cases need a decision, you are not automating a process. You are building a case management tool. That can be the right build at a different price. Say it in the room, not at month three. Our [process documentation fields](https://blog.octacraft.com/process-documentation-automation/) show whether a rule exists at all.

## What we ask you to bring

The requirements gathering session is ninety minutes, and preparation is thirty. Five things make it work.

- One real example, end to end, redacted if you prefer. Paper or a screenshot of the actual record beats a description.
- The count: how many in a normal week, and the report the number came from.
- The systems the work touches, and who owns each one.
- The person who does the work today, for the full ninety minutes.
- The constraint you already know about: a deadline, a regulator, an integration that cannot change, a budget that will not move.

If you cannot bring the count, bring whoever can find it. If you cannot bring the doer, reschedule. A requirements gathering session with substitutes prices a process that does not exist. Choosing between a platform and a purchase is the other decision this feeds, and [custom software versus off the shelf](https://blog.octacraft.com/custom-software-development-company-vs-off-the-shelf/) is how we frame it.

## Frequently asked questions

- ### How long should a requirements gathering session take? Ninety minutes with four people is enough when the process is known. Add a two week measurement period if nobody can produce a volume count. A session past two hours usually covers two processes, and they should be separated.
- ### What is the difference between requirements gathering and a discovery phase? Discovery is the wider period where the problem is understood; the UK Government Digital Service puts one at 4 to 8 weeks. Requirements gathering is the shorter session inside it that fixes scope and produces the pages a quote needs.
- ### Who should attend a requirements gathering session? Four people: the person who does the work today, the person who signs off on the spend, the person who runs it after launch, and one engineer who will build it. Procurement joins when the statement of work is written.
- ### What should come out of requirements gathering? Six pages: a process map, an exception list, a data list, an integrations list, a decision log, and a scope boundary naming what is in and what is out.
- ### Can you quote a build without a requirements gathering session? We can give a range, and we say so. A fixed price without the session is a guess with a number attached, paid for later as a change order. The session turns that range into a price we will hold.

**Related reading:** the integrations list is one of the six pages the session produces, and what belongs on it is set out clause by clause in [the integration contract checklist: eight clauses to insist on](https://blog.octacraft.com/api-integration-services-checklist/).

Related reading: the quote that follows the session, and the waits between the request and the signature, are set out in [proposal software: 6 steps to a same-day quote, and where it stalls](https://blog.octacraft.com/proposal-software-same-day-quotes/).

If you are about to commission a build and cannot describe the process it replaces, [book a requirements session with us](https://go.octacraft.com/talk-to-us/). Bring one real example and the count, and we will run the ninety minutes and send the six pages. You can also [reach the team directly](https://blog.octacraft.com/contact-us/), and more of this work sits in [Open Craft](https://blog.octacraft.com/category/open-craft/).

*Philip Bassey is Octacraft’s Chief of Staff. As part of his responsibilities, he oversees the interdepartmental activities to see that our processes are documented and those that need publishing are published. He writes about the work between a system going live and a team trusting it.*